Alumni Covered Walkway and Alumni Park Construction Underway

 

MASSIVE construction has been taking place along the Engineering Sports Complex near the multi-level carpark building, and the space between the Main and the Central Library Buildings since the early part of April.

The construction of the Alumni Covered Walkway and the Alumni Park is expected to be completed in time for the opening of the AY 2006-2007. These structures are part of the fund raising projects for the UST Fourth Centennial.

The Alumni Covered Walkway is being constructed along the Sports Complex near the multi-level carpark building, while the Alumni Park is being constructed on the space between the Main and the Central Library Buildings. During the Grand Alumni Homecoming held at the Manila Hotel on April 29, 2006, Rev. Fr. Melchor Saria, O.P., Vice Rector for Finance, informed the alumni of these projects and invited them to donate. Donations for the Walkway start at P25,000.00 and for the Park, donations start at P 1M.

Each Walkway donor’s name, degree and year of graduation will be enshrined at the marker, and the Park donor’s name will be inscribed at the base of the giant sculpture by Ramon Orlina. Donors will be acknowledged in the various publications, and will be invited during the enshrinement of their names and the formal blessing of the structures.

On a related development, the Plaza Benavides in front of the Main Building is likewise being constructed.
 

 

 
 
back to web links | Top

 
Copyright © Ramon G. Orlina 2002 - 2008
Web design by artCollaboration